:4x4: John J. Joshua V. and Peter V.
Went to Potlach Creek today to check out the damage.
We found out that the bridge needs to be totally replaced!
What's not broke is rotted
Great Day to Check it out 46* and Sunny!
Here's a list of needed supplies to replace the bridge:
We have already reserved with the core 4 30ft Stringers from the dam debrise

30 2"X or 3"x thick by 8'-10" wide by 10' long Deck boards
4 more Rail Road Ties
60 ft of 4x4 Lumber for side rails
2 Gal Deck coating
Screws for Planking
Timber Locks

2 wooden Signs 1 Potlach Creek & 1 Built by Fairbanks Snow Travelers

Lastly all of the spare hands to help with the building of the bridge

The building will take place in late July or early August
We need to get the needed supplies as soon as possible so we aren't scrambling for them at the last minute
Peter