John J. Joshua V. and Peter V.
Went to Potlach Creek today to check out the damage.
We found out that the bridge needs to be totally replaced!
What's not broke is rotted
Great Day to Check it out 46* and Sunny!
Here's a list of needed supplies to replace the bridge:
We have already reserved with the core 4 30ft Stringers from the dam debrise
30 2"X or 3"x thick by 8'-10" wide by 10' long Deck boards
4 more Rail Road Ties
60 ft of 4x4 Lumber for side rails
2 Gal Deck coating
Screws for Planking
Timber Locks
2 wooden Signs 1 Potlach Creek & 1 Built by Fairbanks Snow Travelers
Lastly all of the spare hands to help with the building of the bridge
The building will take place in late July or early August
We need to get the needed supplies as soon as possible so we aren't scrambling for them at the last minute
Peter
Potlach Creek Bridge
Moderator: john
Potlach Creek Bridge
2015 Polaris Voyager 550 155" track
2014 Polaris 850 XP Touring eps ATV 28: Zilla tires
2014 Polaris RZR 570 26" Swamp Lites
2012 Polaris Pro RMK 800 163"
2012 Polaris 850 XP eps ATV 31" outlaw tires 2" lift
2014 Polaris 850 XP Touring eps ATV 28: Zilla tires
2014 Polaris RZR 570 26" Swamp Lites
2012 Polaris Pro RMK 800 163"
2012 Polaris 850 XP eps ATV 31" outlaw tires 2" lift