Potlach Creek Bridge

This is the place to post events and activities that are not FST specific. So if you or your organization are aware of, or having an event that is snow related, please post it here for all to see. Non registered visitors may post to this forum.

Moderator: john

Post Reply
Message
Author
User avatar
dragonman
Posts: 265
Joined: Tue Mar 02, 2010 8:56 pm
Location: Fairbanks

Potlach Creek Bridge

#1 Post by dragonman »

:4x4: John J. Joshua V. and Peter V.
Went to Potlach Creek today to check out the damage.
We found out that the bridge needs to be totally replaced!
What's not broke is rotted
Great Day to Check it out 46* and Sunny!
Here's a list of needed supplies to replace the bridge:
We have already reserved with the core 4 30ft Stringers from the dam debrise

30 2"X or 3"x thick by 8'-10" wide by 10' long Deck boards
4 more Rail Road Ties
60 ft of 4x4 Lumber for side rails
2 Gal Deck coating
Screws for Planking
Timber Locks

2 wooden Signs 1 Potlach Creek & 1 Built by Fairbanks Snow Travelers

Lastly all of the spare hands to help with the building of the bridge

The building will take place in late July or early August
We need to get the needed supplies as soon as possible so we aren't scrambling for them at the last minute
Peter
2015 Polaris Voyager 550 155" track
2014 Polaris 850 XP Touring eps ATV 28: Zilla tires
2014 Polaris RZR 570 26" Swamp Lites
2012 Polaris Pro RMK 800 163"
2012 Polaris 850 XP eps ATV 31" outlaw tires 2" lift

Post Reply