At last nights board meeting it was decided that we would get some summer trail maintenance work done on:
1) The trail between 10 Mile Merchantile and Chatanika Lodge, specifically the section that goes up the hill through the trees to the top of Iowa Dome. This is about a 3 to 4 mile section. Required work is brushing of overhanging limbs and branchs.
2) The Old Mail Trail between Chatanika Lodge and Circle. were looking at the portion of the trail betwwen Chatanika and Sorrel Creek, about 8 miles worth. Needing brushing and some widening.
No dates set as of yet. We should figure on doing these between June and July sometime.
Please let me know if you have any other suggestions.
We could use 12 to 20 volunteers for each project.
1) The trail between 10 Mile Merchantile and Chatanika Lodge, specifically the section that goes up the hill through the trees to the top of Iowa Dome. This is about a 3 to 4 mile section. Required work is brushing of overhanging limbs and branchs.
2) The Old Mail Trail between Chatanika Lodge and Circle. were looking at the portion of the trail betwwen Chatanika and Sorrel Creek, about 8 miles worth. Needing brushing and some widening.
No dates set as of yet. We should figure on doing these between June and July sometime.
Please let me know if you have any other suggestions.
We could use 12 to 20 volunteers for each project.